Rates & Fees

Effective Date

This Resolution shall take effect upon adoption.

Hernando County Utility District Rates & Charges

Damage Charges

Utility Deposits

$60 - Water only
$235 - Water and wastewater

Including but not limited to, multiple habitants under a master Meter; lease based occupants, apartment, single family homes used as a rental unit service stations; movie theaters; drugstores; cafeterias and restaurants; industrial users; and any other commercial/non-residential users shall pay a deposit of:

Meter Size Water Only Water & Sewer
5/8" $100 $375
 3/4"  $150  $575
 1"  $250  $950
1 1/2" $475 $1,875
2" $750 $2,950
3" $1,500 $5,800
4" $2,350 $9,100
6" $4,700 $18,200
8" $7,500 $29,000
10" $10,700 $41,700
12" $18,700 $72,700

Failure to pay usage charges may result in a deposit increase to three times the average monthly usage charge.

Tap-In Fees and Charges

Charges shall be sufficient to cover the costs of labor, travel and/or materials, including, but not limited to, the original or future replacement meter, meter boxes, corporation stop, valves, appurtenances, and long-term maintenance or replacement thereof.

Water Meter Size Minimum Charge
5/8" X 3/4" Drop In (Meter Only)- Residential Service and General Service $380
3/4" and Above Drop In (Meter Only)- Genal Service Actual Cost
5/8" X 3/4" Drop In and Service Line Installation- Residential Service  $1,015
5/8" X 3/4" Drop In and Service Line Installation- General Service $1,620
3/4" Drop In and Service Line Installation- General Service $1,660
1" Drop In and Service Line Installation- General Service $1,735
1 1/2" Drop in and Service Line Installation- General Service  $2,750
 2" Drop In and Service Line Installation- General Service  Actual Cost
   

May be charged based on special circumstances, such as when roads will be crossed and/or when lines will be extended.

Water and Wastewater Service Rates

Residential Class: Usage Rate (Gallons): per 1,000 gallons of Metered water consumption.

October – September
5/8” STANDARD Meter
AWWA Meter Factor 1
Tier Usage Rate (Gallons): FY 2024 FY 2025 FY 2026 FY 2027 FY 2028
1 0 - 5,000 $1.64 $1.75 $1.87 $1.94 $2.01
2 5,001 - 10,000 $2.00 $2.14 $2.29 $2.37 $2.45
3 10,001 - 20,000 $3.20 $3.42 $3.66 $3.79 $3.92
4 20,001 - 30,000 $4.80 $5.14 $5.50 $5.69 $5.89
5 30,001 – 50,000 $6.90 $7.38 $7.90 $8.18 $8.47
6 50,001 – 75,000 $9.80 $10.49 $11.22 $11.61 $12.02
7 Over 75,000 $13.50 $14.45 $15.46 $16.00 $16.56
  Base Charge $9.85 $10.54 $11.28 $11.67 $12.08

Commercial Class: Usage Rate (Gallons): per 1,000 gallons of Metered water consumption.

October – September
Commercial 5/8” Meters
AWWA Meter Factor 1
Tier Usage Rate (Gallons): FY 2024 FY 2025 FY 2026 FY 2027 FY 2028
1 0 - 10,000 $2.00 $2.14 $2.29 $2.37 $2.45
2 10,001 - 20,000 $3.20 $3.42 $3.66 $3.79 $3.92
3 20,001 - 30,000 $4.80 $5.14 $5.50 $5.69 $5.89
4 30,001 - 50,000 $6.90 $7.38 $7.90 $8.18 $8.47
5 50,001 – 75,000 $9.80 $10.49 $11.22 $11.61 $12.02
6 Over 75,000 $13.50 $14.45 $15.46 $16.00 $16.56
  Base Charge $9.85 $10.54 $11.28 $11.67 $12.08

Residential Class: 10,000* Monthly Gallon Cap
*Note: See Resolution 2012-21 Res Sewer Cap Increase

Usage Rate (Gallons): per 1,000 gallons of Metered water consumption.

Tier (gpm) Usage Rate (Gallons) FY 2024 FY 2025 FY 2026 FY 2027 FY 2028
1 0 –10,000 $6.01 $6.22 $6.44 $6.67 $6.90
2 Over 10,000 No Charge No Charge No Charge No Charge No Charge
  Base Charge $26.00 $26.91 $27.85 $28.82 $29.83

Commercial Class: No cap on consumption.

Usage Rate (Gallons): per 1,000 gallons of Metered water consumption.

Tier  Meter Size FY 2024 FY 2025 FY 2026 FY 2027 FY 2028
1  5/8" Meter $6.01 $6.22 $6.44 $6.67 $6.90
 Base Charge $26.00 $26.91 $27.85 $28.82 $29.83
2  3/4" Meter $6.01 $6.22 $6.44 $6.67 $6.90
 Base Charge $39.00 $40.37 $41.78 $43.24 $44.75
3 1.0" Meter  $6.01  $6.22  $6.44  $6.67  $6.90
   Base Charge $65.00 $67.28 $69.63 $72.07 $74.59
4  1.5" Meter $6.01 $6.22 $6.44 $6.67 $6.90
 Base Charge $130.00 $134.55 $139.26 $144.13 $149.17
5  2.0" Meter $6.01 $6.22 $6.44 $6.67 $6.90
 Base Charge $208.00 $215.28 $222.81 $230.61 $238.68
6  3.0" Meter
   

$6.01

$6.22 $6.44 $6.67 $6.90
 Base Charge $416.00 $430.56 $445.63 $461.23 $477.37
7  4.0" Meter $6.01 $6.22 $6.44 $6.67 $6.90
 Base Charge $650.00 $672.75 $696.30 $720.67 $45.89
8  6.0" Meter $6.01 $6.22 $6.44 $6.67 $6.90
 Base Charge $1,300.00 $1,345.50 $1,392.59 $1,441.33 $1,491.78
9  8.0" Meter $6.01 $6.22 $6.44 $6.67 $6.90
 Base Charge $2,080.00 $2,152.80 $2,228.15 $2,306.14 $2,386.85
10  10.0" Meter $6.01 $6.22 $6.44 $6.67 $6.90
 Base Charge $2,990.00 $3,094.65 $3,202.96 $3,315.06 $3,431.09
11  12.0" Meter $6.01 $6.22 $6.44 $6.67 $6.90
 Base Charge $5,590.00 $5,785.65 $5,988.15 $6,197.74 $6,414.66

Residential Class: Residential Irrigation Meters Prohibited Due to a concern for conserving Florida's drinking water supply, current ordinance prohibits residential water meters solely for irrigation purposes, unless such meters were prepaid and in place on certain property prior to February 17, 2004. New residential water meters solely for irrigation purposes are now prohibited in all service areas.

October – September
5/8” ¾” 1” & 1 ½“ Meters
AWWA Meter FACTOR 1
Tier Usage Rate (Gallons): FY 2024 FY 2025 FY 2026 FY 2027 FY 2028
1 0 - 10,000 $2.00

$2.14

$2.29 $2.37 $2.45
2 10,001 - 20,000 $3.20 $3.42 $3.66 $3.79 $3.92
3 20,001 - 30,000 $4.80 $5.14 $5.50 $5.69 $5.89
4 30,001 - 50,000 $6.90 $7.38 $7.90 $8.18 $8.47
5 50,001 – 75,000 $9.80 $10.49 $11.22 $11.61 $12.02
6 Over 75,000 $13.50 $14.45 $15.46 $16.00 $16.56
  Base Charge $9.85 $10.54 $11.28 $11.67 $12.08

Commercial Irrigation Class: Usage Rate (Gallons): per 1,000 gallons of Metered water consumption.

October – September
Commercial Irrigation 5/8” Meters
AWWA Meter Factor 1
Tier Usage Rate (Gallons): FY 2024 FY 2025 FY 2026 FY 2027 FY 2028
1 0 - 10,000 $2.00 $2.14 $2.29 $2.37 $2.45
2 10,001 - 20,000 $3.20 $3.42 $3.66 $3.79 $2.85
3 20,001 - 30,000 $4.80 $5.14 $5.50 $5.69 $3.79
4 30,001 - 50,000 $6.90 $7.38 $7.90 $8.18 $5.70
5 50,001 – 75,000 $9.80 $10.49 $11.22 $11.61 $9.49
6 Over 75,000 $13.50 $14.45 $15.46 $16.00 $13.29
  Base Charge $9.85 $10.54 $11.28 $11.67 $12.08

[1] For purposes of billing, the customers Meter size is used in conjunction with the American Water Works Association (AWWA) Meter factor to calculate the minimum monthly billing charge.
[2] Consumption blocks to be applied on a per Meter size/AWWA Meter factor.

Other Fees and Charges

A service fee shall be charged for all customer services, including, but not limited to, account transfers and/or account reinstatements, scheduling service disconnection for delinquent charges regardless whether service is disconnected prior to payment, additional service trips to a location due to customer error, and service trips to repair damage to District property caused by the customer or other unauthorized persons performing work for or on behalf of the customer. The fee shall be doubles for service trips on workdays after 3:30 p.m. and on Saturdays, Sundays, and County Holidays.

  • Trip charge (including turn on/off and premise visits) on workday's from 8 a.m. to 3:30 p.m.: $50
  • Trip charge (including turn on/off and premise visits) on workdays after 3:30 p.m., weekends and County holidays: $100
  • Trip charge to turn off meter for emergency leak from 8:00 a.m. to 3:30 p.m. (customer request): $0
  • Establish new account (initiate service) $50
  • Trip charge to turn off meter for emergency leak after 3:30 p.m., weekends and holidays: $0
  • Trip charge to turn on meter after repair of emergency leak on workdays from 8:00 a.m. to 3:30 p.m.: $50
  • Trip charge to turn on meter after repair of emergency leak on workdays after 3:30 p.m., weekends and holidays: $100
  • Disconnect due to delinquent or non-payment of services $20
  • Reconnect due to delinquent or non-payment of services before 3:30: $50. After 3:30 p.m., weekends and holidays: $100
  • Backflow testing and/or inspection: $200
  • Meter Download at the customer request: $55 (no charge for inaccurate meter)
  • Installation of lockbox on meter at the customer's request: $45
  • Meter certification bench test: (no charge for inaccurate meter) $110
  • Meter tampering, (broken meter, cap, lock or any other damage): $150 for initial; $250 for subsequent
  • Removal of meter or pull meter up to 1" (delinquent or unauthorized use): $100
  • Return trip due to obstruction, customer negligence or at customer request, on workday's from 8 a.m. to 3:30 p.m. (each attempt): $50
  • Return trip due to obstruction, customer negligence or at customer request, on workday's after 3:30 p.m.: $100
  • Septage dumping - delinquent and account reinstatement: $150
  • Returned mail - per piece returned (not including final statements): $5 
  • Lien filing fee: $80
  • Release of Lien filing fee: $50
  • Late fee (if bill remains unpaid next month): 5% of unpaid balance
  • Property Debt Search, per parcel $15

A fee of $105.00 per 1,000 gallons shall be charged to all commercial users for treating septic and/or chemical toilet waste.

Temporary Water Service Rates, Fees and Charges:

Deposits for temporary water service are the same as in Section 1. However, for one-time bulk water purchases, the deposit shall equal the total of the estimated bulk water purchase.

Deposits for temporary hydrant Meters shall be $2,650.00 or the actual replacement cost of the hydrant Meter assembly, whichever is greater.

Deposits for temporary service accounts shall not be refunded until the customer's final bill. At such time, the deposit is applied against the account balance and charges for damage and/or loss, and any deposit (credit) balance is refunded to the customer.

A non-refundable service charge (cost of locating the water line, installation of temporary Meter, and establishing the utility account) for temporary water service is $150. A service charge to move or relocate the meter shall be $65.00.

The charge for temporary water service is based on a usage charge for total consumption plus a minimum monthly charge.

  • Hydrant Meter 3” or Larger:  $156.50 per month

Water and Sewer Connection Fees will be assessed based upon the American Water Works Association (AWWA) Equivalency Factors as shown in table below:

Meter
Size
AWWA/ERU
Meter Factor
Connection Fees
Water Sewer Total
5/8 1 $ 2,397 $ 5,563 $ 7,960
3/4 1.5 $ 3,595 $ 8,344.50 $ 11,940
1 2.5 $ 5,992.50 $ 13,907.50 $ 19,900
1-1/2 5 $ 11,985 $ 27,815 $ 39,800
2 8 $ 19,176 $ 44,504 $ 63,680
3 16 $ 38,352 $ 89,008 $ 127,360
4 25 $ 59,925 $ 139,075 $ 199,000
6 50 $ 119,850 $ 278,150 $ 398,000
8 80 $ 191,760 $ 445,040 $ 636,800
10 115 $275,655 $ 639,745 $ 915,400
12  215  $ 515,355  $ 1,196,045  $ 1,711,400

Upon selection of the appropriately sized water Meter necessary to provide the level of service desired by the customer, the connection fees for water and/or sewer service, as indicated above, will become due and payable. If in the future the customer desires to increase the Meter size, additional connection fees will be due, allowing credit for that amount previously paid. There will be no refunds for Meter downsizing.

Returned Check Charges and Rejected Electronic Fund Transfer Charges.

The Hernando County Utilities Department shall annually review the rates, fees and charges established in accordance with the requirements of outstanding bond resolutions and covenants and the costs and expenses of the water and wastewater utility system. A rate study and analysis shall be conducted prior to the expiration of the 2028 Fiscal Year, unless otherwise provided by the Board. If no rate study and analysis is conducted, the water and wastewater rates shall be adjusted each fiscal year beginning October 1, 2028, in accordance with the Consumer Price Index (CPI) adjustment approved by the Florida Public Service Commission. 

Section 9. Repealing and superseding prior and conflicting resolutions.

All prior and conflicting resolutions or parts of resolutions, including but not limited to, Resolution No. 19-151 and Section 7 of Resolution No. 2009-121, shall be repealed, rescinded, superseded, and replaced by this Resolution effective October 1, 2024.

This Resolution shall take effect upon adoption.

Damage Charges

Annual Review and Adjustments.

The Hernando County Utilities Department shall annually review the rates, fees and charges established in accordance with the requirements of outstanding bond resolutions and covenants and the costs and expenses of the water and wastewater utility system. A rate study and analysis shall be conducted prior to the expiration of the 2028 Fiscal Year, unless otherwise provided by the Board. If no rate study and analysis is conducted, the water and wastewater rates shall be adjusted each fiscal year beginning October 1, 2028, in accordance with the Consumer Price Index (CPI) adjustment approved by the Florida Public Service Commission. 

Section 9. Repealing and superseding prior and conflicting resolutions.

All prior and conflicting resolutions or parts of resolutions, including but not limited to, Resolution No. 19-151 and Section 7 of Resolution No. 2009-121, shall be repealed, rescinded, superseded, and replaced by this Resolution effective October 1, 2024.

Contact Us

Hernando County Government Main Line
(352) 754-4000

Contact Us

Sign up to our Newsletter

Stay up to date on the county's activities, events, programs and operations by subscribing to our eNewsletters.

// //