home Return to Hernando County Home Page

county sealHernando County Development Department: Permitting, Inspections, Contractor Licensing
Main Office
789 Providence Blvd  Brooksville, FL 34601
(352) 754-4050     Fax (352) 754-4416
 
RESOLUTION NO. 2002-310

PDFDownload this file (PDF format)

WHEREAS, Hernando County has established development requirement conditions for development review and approval by the Development Department; and

WHEREAS, administration of those requirements incurs a cost to the Development Department; and

WHEREAS, it is the desire of the Board of County Commissioners for the Development Department to be fee based and self-supporting; and

WHEREAS, Hernando County has established ordinances and land use regulations to be enforced by the Development Department; and

WHEREAS, it is the desire of the Board of County Commissioners to cover these costs by a fee schedule; and

WHEREAS, the Board of County Commissioner may waive building or zoning permit fees for any person, firm, business, non-profit organization, or government entity, provided sufficient funds to cover permitting fees will be paid to the Development Department by the Board; and

WHEREAS, it is the intention of the Board of County Commissioners to allow adequate notice prior to the implementation of a new fee schedule, this schedule shall become effective January 1, 2003. Construction contracts signed prior to the implementation date shall be issued permits through the current schedule of fees for sixty (60) days from date of implementation of this resolution.

NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF HERNANDO COUNTY, FLORIDA, AS FOLLOWS:

SECTION 1. ZONING

ZONING

Note: These fees are non-refundable.
A Comprehensive Zoning Review includes but is not limited to a review of land uses as it pertains to all applicable county codes and regulations.

DESCRIPTION FEE AMOUNT
Comprehensive Zoning Review, Residential $50.00
Comprehensive Zoning Review, New:

Commercial / Industrial

Agriculture Commercial in Excess of 1/4 Acre of Developed Area

$300.00 + $20.00 / Acre
Comprehensive Zoning Review:

Addition, Commercial & Industrial

Remodel/Alteration

Temporary Use

$100.00
Comprehensive Zoning Review:

Model Home & Model Home Center (other than commercial property)

$50.00
Flood Plain Development Permit, 50% Rule Compliance $25.00
Landscape Ordinance Review, Residential

*Note: If landscape permit is requested prior to issuance of building permit, this fee will be charged on the separate permit and on the building permit.

$45.00
Landscape Ordinance Review, Commercial

*Note: If landscape permit is requested prior to issuance of building permit, this fee will be charged on the separate permit and on the building permit.

$150.00 + $10/Acre Over 2 Acres
Similarity Ordinance Review & Inspection Category I: $25.00

Category II: $75.00

DEVELOPMENT REVIEW, OTHER:

Note: These fees are non-refundable, and are not credited toward the total cost of the permit. These fees are payable at the time of permit application.

Site Plan Review or Modification to Site Plan,

Includes Maximum of 2 Reviews on Same Project

$350.00
Engineering Site Plan Review or Modification to Site Plan $150.00
Three (3) or More Reviews on Same Project $250.00 Each Additional Review
Conceptual Review $250.00
Design Standards for Large Retail Projects Review $1,750.00
Enhanced Standards Ordinance Review $150.00 / Building
New Development Sign $25.00 / Sign
Project Inquiry Workshop $150.00

SECTION 2. RESIDENTIAL/NON-COMMERCIAL BUILDING PERMIT FEES

GROUP I: $50.00

Note: Group I permit fees are due at the time of application and are non-refundable.

Above Ground Pool
Door/Window Change Out (Any number of same project.)
Driveway (From House to ROW Line)
Electrical Permit
Fence
Fireplace (Any Type)
Gas Permit, L. P. or Natural
Lawn Sprinkler, Residential
Mechanical Permit
Plumbing Permit
Pool Heating System
Recreational Vehicle Permit (2 Week Maximum)
Spa
Stemwall

GROUP II: $100.00

Note: Group II Fees:

  • *Include a $50.00 Comprehensive Zoning Review
  • Are Payable at the Time of Application
  • Are Non-Refundable
Aluminum (Includes All Aluminum Work)*
Boat Lift*
Deck*
Dock*
Re-Roofing, Residential
Residential Demolition (Other than Complete Structure)
Retaining Wall*
Siding, Replacement (More than 25% Total Wall Area)
Seawall*
Slab*
Storage Building, Less than 200 s. f.,*

(Non-Commercial, Site Built, or 1 Piece)

**Includes Applicable Plumbing and/or Electrical Fees

Wood Frame (Includes Carport, Porches, Etc.)*

GROUP III: $150.00

Note: Group III Fees:

  • Include a $50.00 Comprehensive Zoning Review

  • Are Payable at the Time of Application

  • Are Non-Refundable

House or Mobile Home Move
In-Ground Swimming Pool
Mobile Home Additions
Residential Demolition, Complete Structure

(no zoning review required)

Storage Building, Over 200 s.f., to include:

Non-Commercial, Engineered Storage Building

Site Built Storage Building

Storage Building, 1 Piece

**Plumbing and/or Electrical Fees are Additional

Travel Trailer Set-Up, 6 Month Maximum

GROUP IV: $300.00

Note: Group IV Fees:

  • Include a $50.00 Comprehensive Zoning Review
  • Are Payable at the Time of Application
  • Are Non-Refundable
Mobile Home Set-Up
Park Model Set-Up
Single Family Home Placement

GROUP V: Residential, 1 & 2 Family, Non-Commercial

Note: Group V Requires Comprehensive Zoning Review, Plans Review, and Other Fees as Regulated by Florida Statute and Local Ordinances

Group V Permits Require Payment of Administrative Review Fee at Time of Application. Administrative Review Fee is credited toward total permit cost, and is non-refundable.

PERMIT TYPES FEES
Single Family Residence, New

(Includes Modular Homes)

Administrative Review Fee: $300.00

Residential Additions

Administrative Review Fee: $100.00

  • Building $0.10 s.f. January 1, 2003 - June 30, 2003

$0.11 s.f. July 1, 2003 - December 31, 2003

$0.12 s.f. January 1, 2004

  • Electric $0.04 s.f. of Living Area
  • Plumbing $0.04 s.f. of Living Area
  • Mechanical $0.04 s.f. of Living Area
  • $50.00 Plan Review Fee
  • $50.00 Comprehensive Zoning Review
  • $45.00 Landscape Ordinance Review
  • $45.00 Drainage Compliance Review
  • $20.00 Address Assignment/Review
  • $0.005/S. F. DPR Fee (F.S.468.631)
  • $0.005/S. F. Radon Fee (F. S. 553.721)
  • Similarity Ordinance Review & Inspection, If Applicable (Cat.I: $25 Cat. II: $75)
Remodel & Repairs (SFR & MH)

Administrative Review Fee: $50.00

$50.00 Minimum or $.12/sq ft of Remodel/Repair Area, Whichever is Greater

$30.00 Plan Review Fee

SECTION 3. COMMERCIAL BUILDING PERMIT FEES

Group VI - New Commercial Construction (Includes Modular Office)

Note: Group VI Requires Comprehensive Zoning Review, Plans Review, and Other Fees as Regulated by Florida Statute and Local Ordinances

Group VI Permits Require Payment of Administrative Review Fee at Time of Application

Administrative Review Fee is credited toward total permit cost, and is non-refundable.

Building Occupancy Classifications: Fees:
Assembly

Business

Education

Factory

Hazardous

Institution

Mercantile

Residential

Storage

**Administrative Review Fee: $600.00

  • $350.00 Development Review Fee
  • $150.00 Engineering Fee
  • Building $0.12 PSF*
  • Electric 0.04 PSF*
  • Plumbing 0.04 PSF*
  • Mech. 0.04 PSF*
  • Fire 0.04 PSF**
  • Plan Review 0.03 PSF**
  • $300 + $20/Acre Comprehensive Zoning Fee
  • $0.005/s.f. DPR Fee (F.S.468.631)
  • $0.005/s.f. Radon Fee (F. S. 553.721)
  • $150 + $10/Acre Over 2 Acres Landscape Ord Review

*$100.00 Minimum Fee (Each Trade)

** $50.00 Minimum Fee (Fire and Plan Review)

Model Home

**Administrative Review Fee: $300.00

*On Commercially Zoned Property Only (For Residential Property, See Single Family Residence Fees and Model Home Conversion Fees.)

  • $350.00 Development Review Fee
  • $150.00 Engineering Fee
  • Building $0.12 PSF*
  • Electric 0.04 PSF*
  • Plumbing 0.04 PSF*
  • Mech. 0.04 PSF*
  • Fire 0.04 PSF**
  • Plan Review 0.03 PSF**
  • $300 + $20/Acre Comprehensive Zoning Fee
  • $0.005/s.f. DPR Fee (F.S. 468.631)
  • $0.005/s.f. Radon Fee (F. S. 553.721)
  • $150 + $10/Acre Landscape Ord Review

*$100.00 Minimum Fee (Each Trade)

** $50.00 Minimum Fee (Fire and Plan Review)

Model Home on Residential Property

**Administrative Review Fee: $300.00

  • $350.00 Development Review Fee
  • Building $0.10 s.f. Jan 1, 2003 - June 30, 2003

$0.11 s.f. July 1, 2003 - Dec 31, 2003

$0.12 s.f. January 1, 2004

  • Electric $0.04 s.f. of Living Area
  • Plumbing $0.04 s.f. of Living Area
  • Mechanical $0.04 s.f. of Living Area
  • $50.00 Plan Review
  • $50.00 Comprehensive Zoning Review
  • $45.00 Landscape Ordinance Review
  • $45.00 Drainage Requirements Review
  • $20.00 Address Assignment/Review
  • $0.005/S. F. DPR Fee (F.S.468.631)
  • $0.005/S. F. Radon Fee (F. S. 553.721)
  • Similarity Ordinance Review & Inspection, If Applicable (Cat.I: $25 Cat. II: $75)
Model Home Conversion

*Payable at Time of Application

From SFR to Model

From Model to SFR

  • $150.00 Development Review Fee
  • $200.00 Model Home Conversion Fee
  • $200.00 Model Home Conversion Fee

Group VII - Additions

Note: Group VII Requires Comprehensive Zoning Review, Plans Review, and Other Fees as Regulated by Florida Statute and Local Ordinances

Group VII Permits Require Payment of Administrative Review Fee at Time of Application

Administrative Review Fee is credited toward total permit cost, and is non-refundable.

Building Occupancy Classifications: Fees:
Assembly

Business

Education

Factory

Hazardous

Institution

Mercantile

Residential

Storage

Administrative Review Fee: $400.00

  • $350.00 Development Review Fee
  • $150.00 Engineering Fee
  • Building $0.12 PSF*
  • Electric 0.04 PSF*
  • Plumbing 0.04 PSF*
  • Mech. 0.04 PSF*
  • Fire 0.04 PSF**
  • Plan Review 0.03 PSF**
  • $300 + $20/Acre Comprehensive Zoning Fee
  • $0.005/s.f. DPR Fee (F.S.468.631)
  • $0.005/s.f. Radon Fee (F. S. 553.721)
  • $150 + $10/Acre Landscape Ord Review

*$100.00 Minimum Fee (Each Trade)

** $50.00 Minimum Fee (Fire and Plan Review)

GROUP VIII

COMMERCIAL REMODEL / ALTERATIONS

Note: Group VIII Requires Comprehensive Zoning Review, Plans Review, and Other Fees as Regulated by Florida Statute and Local Ordinances

Group VIII Permits Require Payment of Administrative Review Fee at Time of Application

Administrative Review Fee is credited toward total permit cost, and is non-refundable.

Building

Electrical

Mechanical

Plumbing

Fire

Administrative Review Fee: $100.00

$0.12 / Sq. Ft. ($100.00 Minimum)

$0.04 / Sq. Ft. ($50 Minimum)

$0.04/ Sq. Ft. ($50 Minimum)

$0.04 / Sq. Ft. ($50 Minimum)

$0.04/ Sq. Ft. ($50 Minimum)

$0.03/ Sq/ Ft. Plan Review Fee ($50 Minimum)

$100.00 Comprehensive Zoning Fee, If Applicable

*Note: Only fees consistent with work being done will be charged on remodel and alterations.

OTHER COMMERCIAL PERMIT FEES

These permit fees are payable at the time of application and are non-refundable.

DEMOLITION, COMMERCIAL $150.00
DOCK, Concrete or Wood Pilings $75.00
ELECTRICAL

Service Change

New Circuit Installation

New Service Installation (Limit 3 Circuits)

Parking Lot Lighting

Lift Stations / Sump Pump

$50.00

$50.00 + $15.00/Circuit Over 3 Circuits

$75.00

$150.00

$20.00 Inspection Fee

FIRE

Fire Alarm, New or Alteration

 

Fire Hood System

Fire Suppression System

Fire Sprinkler System Alterations

Fire Sprinkler System, New

Up to 48 Heads

49 Heads & Over

$40.00 up to 3 Devices

$80.00 Over 3 Devices

$100.00

$100.00

$150.00 Per Test

$150.00 Per Test, 2 Test Minimum

$0.04 / s.f.

FOUNDATION PERMIT

(Cost Not Credited to Full Bld Permit)

20% of Applicable Permit Fee
GAS

Piping, Tanks, New Appliances (Individually or Any Combination)

Dispenser Unit (Includes Electric & Fire)

$75.00

$100.00

LAWN SPRINKLER, COMMERCIAL $150.00
MECHANICAL

Condenser or Air Handler Changeout

Add or Replace Ductwork

Refrigeration Installation

$ 50.00 Up to 5 Tons Total

$100.00 Over 5 Tons Total

$ 50.00 Up to 5 Drops

$100.00 Over 5 Drops

$100.00 Under 10 Tons

$200.00 Over 10 Tons

RETAINING WALL $0.50/Linear Foot ($50 Minimum)
RE-ROOF, COMMERCIAL

Up to 5,000 S. F.

Over 5,000 S. F.

$200.00

$350.00

SEAWALL $0.50/Linear Foot ($50 Minimum)
SEWER $50.00
SIGNS

Onsite or Offsite

Up to150 sq. ft.

Over 150 sq. ft.

Wall Sign

Fee Per Sign:

$100.00 + $50.00 Elec, if applicable

$150.00 + $50.00 Elec, if applicable

$75.00 for 1st Sign + $25 Ea. Additional Sign @ Same Location + $50.00 Elec, if applicable

SOLAR SYSTEM $100.00
SPA (Under 200 Gallons, Includes Elec & Plbg) $100.00
SWIMMING POOL (Includes Elec & Plbg) $200.00

$100.00 Comprehensive Zoning Review

TOWERS

Communication Tower

Tower Co-Location

  • $300.00 ( Includes Comprehensive Zoning Review, Electric and Fire Inspections )
  • $350.00 Development Review Fee
  • $150.00 Engineering Fee

$200.00 ( Includes Comprehensive Zoning Review, Electric and Fire Inspections )

ADMINISTRATIVE COMMERCIAL PERMIT FEES

These fees are payable at the time of permit application and are non-refundable.

CERTIFICATE OF USE $100.00 + $50.00 Electric, If Applicable
TEMPORARY USE $100.00
LAND CLEARING / SITE ALTERATION

(Not in Conjunction with Building Permit or Application)

$250.00
PARKING LOT
  • $100.00 Permit Fee
  • $350.00 Development Review Fee
  • $150.00 + $10/Acre Over 2 Acres Landscape Review Fee
TEMPORARY LAND USE $100.00
TENTS

$200.00 + $50.00 Elec, if applicable

Note: Fees Include Comprehensive Zoning Review

SECTION 4. CONTRACTOR LICENSING

CERTIFICATE OF COMPETENCY FEES

Application Fee (Non-Refundable) $50.00
Issuance and Renewal Fee, Annual $100.00 / Year
Inactive Certificate of Competency 50% of Issuance/Renewal Fee
Late Renewal Penalty 50% of Renewal Fee

(This is in addition to regular renewal fee.)

Reactivation Fee (Inactive to Active) Renewal Fee
Certificate of Authority $75.00
Replacement / Duplicate Card $75.00
Special Examination Fee $150.00 + Testing Firm Costs
Competency Exam Fee for Permit Applicant $20.00 + Testing Firm Costs

OTHER CONTRACTOR LICENSING FEES

Bi-Annual County Registration Fee $75.00
Bi-Annual File Maintenance Fee (State Certified Contractors) $75.00
Registration Reactivation $75.00
Change of Status (Other than from Inactive to Active) $75.00
Letter of Reciprocity $75.00

FINES & PENALTIES

Failure to Possess or Have Readily Accessible Proof of Being Duly Licensed

First Offense $50.00

Second Offense $250.00

Third and Repeat Offense $500.00

Failure to Obtain Required Permit Prior to Commencement of Work

First Offense $250.00

Second Offense $500.00

Repeat Offense $500.00 And/or

Disciplinary Action and Sanctions Pursuant to Construction Licensing Ordinance, to Include but Not Be Limited to Stipulation And/or Board Action and Applicable Penalties.

Failure to Obtain Inspections

First Offense $500.00

Repeat Offense $500.00 And/or

Disciplinary Action and Sanctions Pursuant to Construction Licensing Ordinance, to Include but Not Be Limited to Stipulation And/or Board Action and Applicable Penalties.

Violate Stop Work Order

First Offense $500.00

Repeat Offense $500.00 And/or

Disciplinary Action and Sanctions Pursuant to Construction Licensing Ordinance, to Include but Not Be Limited to Stipulation And/or Board Action and Applicable Penalties.

Violation of Adopted Board Rules As Adopted and Established in Board Rules (Maximum $500 If by Citation)
Violation of Stipulation $500.00
Failure to Contain Trash (Outside Property Lines) First Offense $50.00

Second Offense $250.00

Third and Repeat Offense $500.00

Burial of Debris $500.00
Illegal Removal of Protected or Regulated Tree $500.00 and/or Penalties as Established by Hernando County Landscape Ordinance
Failure to Comply with Tree Mitigation Order $500.00 and Mandatory Hearing before Special Master
Failure to Comply with Landscape Ordinance First Offense $50.00

Second Offense $250.00

Third and Repeat Offense $500.00

Material Code Violation*

First Offense $1,000.00

Second Offense $2,000.00

Third & Repeat Offense $3,000.00

*Upon a determination of the building official or his/her designee that a licensee, certificate holder, or registrant licensed under chapter 455, chapter 471, chapter 481, chapter 489 or Hernando County Construction Code, has committed a material violation of the Florida Building Code and failed to correct the violation within a reasonable time, a fine shall be imposed of no less than $500 and no more than $5,000 per material violation. The established fine schedule is a guideline and the Building Official or his/her designee may consider aggravating or mitigating circumstances relative to the particular violation for the purpose of imposing a fine other than the above schedule but no less than $500 and no more than $5000. (Specific Authority s 553.781)
Failure to Properly Mark Vehicle Utilized for Construction Related Purposes First Offense $50.00

Second Offense $250.00

Third & Repeated Offense . . . $500.00 And/or Disciplinary Action and Sanctions Pursuant to Construction Licensing Ordinance, to Include but Not Be Limited to Stipulation And/or Board Action and Applicable Penalties.

Investigative Cost No. of Investigative Man Hours x $75.00 per hour
Legal Costs / Special Master No. of Billed Legal Hours or Estimate of Legal Time x $225.00/Hr. (Maximum)
Unlicensed Contractor Citation $500.00 All Offenses
Tenant vs. Landlord Unsafe Building Service Request

(Includes Multi-Trade Scheduled Inspection and Report)

$175.00

SECTION 5. MINING

MINING FEES

Annual Inspection $425.00
Blasting Fee $50 / Blast or $10,000 / Year
Excavation Permit $500.00
Master Mining Plan Approval (MAMPA) $2.00/ Acre or $1,500 Minimum
Mining Operation Plan Approval (MOPA) $50 / Acre or $2,000 Minimum

SECTION 6. ADMINISTRATIVE FEE SCHEDULE

ADMINISTRATIVE REVIEW FEES

Administrative Review Fees are payable at the time of application. The fee is credited toward the total permit cost, and is non-refundable.

Single Family Residence, New

(Includes Modular Homes)

$300.00
Residential Additions $100.00
Remodel & Repairs (SFR & MH) $50.00
New Commercial Construction $600.00
Model Home $300.00
Commercial Additions $400.00
Commercial Remodel/Alterations $100.00

ADMINISTRATIVE APPEALS

Note: Administrative Costs are costs associated with, but not limited to, the preparation of the following administrative functions: certified mailing, notice of public hearing, notice of intent, and are calculated at a rate of $75/hour (1 hour minimum).

Administrative Costs $75/Hour (1 Hour Minimum)
Appeals of Administrative Decisions (Zoning) $100.00
Conditional Use Permit Applications - Administrative $100.00
Administrative Variances $150.00
Variances Requiring Board Action $250.00
Administrative Easement Vacation $150.00
Majestic or Specimen Tree Removal Appeal $50.00
Appeal to Impact Fee Committee $150.00
Appeal to Construction Board of Adjustments & Appeals $500.00
Appeal to Consumer Review Panel / Probable Cause Panel $150.00

PERMITTING / PLAN REVIEW
Builder Changing Sub-Contractor After Construction in that Trade has been Started

(Does not include plan review or alterations, if required.)

$50.00
Change of Main Contractor on Issued Permit (Includes Owner/Builder to Contractor) $125.00
Change of Qualifier on Issued Permit $125.00
Reactivate an Invalid Permit $50.00
Extension Letter

(Includes Permit Extension, Application Extension)

$50.00
Stamp Additional Plans, Residential $25.00 / Set
Alteration of Approved Residential Building or Site Plans $50.00 Minimum or See Single Family Residence Fees
Review of Residential A/C plans, Manual J, MIS, and Energy Form, if applicable, Submitted by a Mechanical Contractor Other Than Original Contractor $50.00
Alteration of Approved Commercial Building or Site Plans $100.00 / Trade / Review
Duplicate Permit Card $15.00
Duplicate Plans, Certified Copy $5.00 / Page, 24 x 36

$10.00 / Page, 36 x 48 or Larger

Priority Permit Review $200.00

INSPECTIONS / RE-INSPECTIONS

Additional / Partial Inspections $30.00 / Inspection
After Hours Inspection $150.00 / Inspector / Trip, Up to 2 Hrs.

+ $75.00 / Hour or Portion thereof over 2 Hrs.

Emergency Non-Scheduled Inspection $100.00
Damage Assessment Inspection, Pre-Construction

*Fee will be added to the cost of the permit

$50.00
Inspection Fee $20.00 / Inspection
Notice of Commencement Not Posted $50.00
Pre-Inspection of Existing Commercial Building Prior to Permitting $200.00
Reinspection Fees

First Reinspection

Second Reinspection

Third Reinspection

No Charge

$50.00

$100.00

Specific Time Schedule Inspection $75.00

OTHER ADMINISTRATIVE FEES

Annual Subscription to Department Reports/Agendas/Distribution Memos $25.00
Copies, Standard Refer to BCC Policy for Photocopies
Copies, 11 x 17 $.30 / Page
Copies, Microfilm $.30 / Page
Blueprint, 24 x 36 $5.00 / Page
Blueprint, 36 x 48 or Larger $10.00 / Page
Permit / Contractor Reports $20.00
Permit Activity by Area Report $75.00
Reports Downloaded from Internet (Password Required) $40.00
Letter of Flood Zone Information $30.00 / Parcel
Zoning Map $2.00 / S.F.
Zoning Research and Review, Written $30.00 / Parcel

SECTION 7. REFUND POLICY

A. The following fees are non-refundable:

B. All refunds of issued permits will be assessed an administrative fee of 1/3 of the plan review fee.

C. All refunds must be requested in writing and submitted within one year of the permit issuance date.

D. No refund shall be granted if work has commenced or if permit has become inactive or expired.

SECTION 8. GENERAL NOTES

1. If it is substantiated that a contractor renewing his license was not notified via computer generated renewal notice or other electronic notification of a pending renewal period, the applicable late fee will be waived.

2. Fees calculated per square foot shall be assessed using the gross floor area, unless otherwise specified.

3. Final interpretation of method of calculation of any fee shall be resolved by the Development Department Director/Building Official or his designee.

4. Any fees not listed above as to the cost may be determined based on equivalent or similar permit types, and are subject to approval of the Building Official or his/her designee.

5. The Building Official or his designee may adjust the permit fees listed herein when it is determined that a new or additional inspection becomes necessary due to implementation of code requirements, revisions, etc. The inspection fee shall be $20.00 per inspection.

6. The method of measurement for commercial renovation projects shall be the square footage for the entire area of the room or space upon which work is to occur. Should this calculation prove to be less than the minimum fee, the minimum shall be charged.

7. The valuation of the job may be used to calculate the fees to be assessed when determined necessary by the Development Department Director/Building Official or his designee. The fees shall be determined as follows:

VALUATION FEE
$1,000 and less No fee, unless inspection required, in which case a $20.00 fee for each inspection shall be charged.
$1,000 - $50,000 $15.00 for the first $1,000 plus $5.00 for each additional thousand or fraction thereof, to and including $50,000.00.
$50,000 - $100,000 $360.00 for the first $50,000.00 plus $4.00 for each additional thousand or fraction thereof, to and including $100,000.00.
$100,001 - $500,000 $460.00 for the first $100,000.00 plus $3.00 for each additional thousand or fraction thereof, to and including $500,000.00
$500,000 - and Up $1,660.00 for the first $500,000.00 plus $2.00 for each additional thousand or fraction thereof.
Plan checking fee shall be equal to one-half of the building permit fee as set forth above. Such plan-checking fee is in addition to the building permit fee.

ADOPTED BY THE BOARD OF COUNTY COMMISSIONERS IN REGULAR SESSION THIS 3rd DAY OF December, 2002.

BOARD OF COUNTY COMMISSIONERS

HERNANDO COUNTY, FLORIDA

BY_____________________________________

HANNAH M. ROBINSON, CHAIRPERSON

ATTEST________________________________

KAREN NICOLAI, CLERK